Site visit, Poured Bent 1 Cap

 When I arrived, contractor was ready to pour Bent 1 Cap.






 Concrete arrived at 3:25, I tested the concrete: Slump was 3", Air 4.8%, Temp 81°. Made 3 cylinders


 Pour went good, left site at 4:30